Image Store galleries – how to change order and put into columns

•

Bring Your Business to Life › Support › Image Store › Image Store galleries – how to change order and put into columns

Viewing 3 posts – 1 through 3 (of 3 total)
  • Author
    Posts
  • #589188
    pamelazero
    Participant

    Here’s the page with the issues: http://www.scottshueyphotography.com/?page_id=546&preview_id=546&preview_nonce=2a3141bec9&preview=true

    The issue I’m having is the layout on the Image Store page itself.

    1. The images don’t line up in 3 columns like they do on other versions of the site (see http://176.32.230.1/pamelazerotest.com/scottmockups2/?page_id=334 for a version that has the images line up correctly). I’ve double checked all the settings including the General Settings tab under Settings under Galleries. What am I missing here?

    2. I need a way to change the order of the galleries shown on the image store page. I want them to be in alphabetical order – A-Z. Right now they’re in the order I loaded them up in. It would seem that the Attributes/Order input field on the individual galleries pages would be where I’d set that order but the field either keeps resetting to 1 and when it does not, the order does not change.

    Any thoughts are welcome! Thanks all.

    #596709
    Xpark Media
    Keymaster

    @pamelazero

    We can’t view post that are not live in your site, but for the most part these are conflicts with the theme styles.

    The sort order can be change for each gallery under the “gallery info” box, or for all galleries in settings > gallery > Sort images + Sort Direction

    We test it the sort order and it works. what version and what is the setting you are using?

    #597037
    pamelazero
    Participant

    I found out how to change the image columns – turned out there was a setting to change in Lightbox and Colorbox.

    However, let me be very very clear and please read this carefully.

    I am trying to change the order of the GALLERIES. Not the images inside them.

    How do I change the order of the GALLERIES themselves? For example, if I have 3 galleries, named Apple, Banana, Cherry.

    I loaded them up and their order is Banana, Apple, Cherry.

    I need their order to be Apple, Banana, Cherry. Please note – I’m talking about the galleries, not the images inside them.

    How do I change their order? Right now the only way to do so is by deleting them and reinstalling them in opposite order from how I want them created. That means reloading hundreds of images and I’m trying to avoid doing that.

    Any advice? Thanks.

Viewing 3 posts – 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.